Commercial Circulars

JPR5-1 to JPR5-200| JPR5-200 to JPR5-439| JPR5-440 to JPR5-500 | JPR5-601 to Present


     Net metering Application form |
Annexure | Corporate Level Appellate Meeting dt 28.12.2016


     Corporate Level VCR Monitoring & Review Committee Meeting dt 01.02.2017


     Corporate Level Grievance Redressal Cum Settlement Metting dt 20.02.2017

 

Order Reference
Download
Link
Regarding withdrawing rate hike in Agriculture category
JPR5-840 dt 20.02.2017
Organisation of camps for redressal of consumer grievances
JPR5-839 dt 20.02.2017
Load checking of metered Agriculture connections
JPR5-838 dt 20.02.2017
Regrading releasing the domestic connection in Rural Area
JPR5-837 dt 02.02.2017
Regrading Business Registration Number
JPR5-836 dt 02.02.2017
Amnesty Scheme shall also be for domestic and agriculture category consumers upto 31.03.2017
JPR5-835 dt 31.01.2017
Voluntary Load Declaration Scheme: Date extended upto 31.03.2017
JPR5-834 dt 31.01.2017
Clarification regarding Mukhya Mantri Gramin Gharelu Connection Yojna
JPR5-833 dt 31.01.2017
Regarding Consitution of working committee
JPR5-832 dt 25.01.2017
Regarding tariff payable to temporary connection released for lighting on festiv of Diwali-2016
JPR5-831 dt 04.01.2017
Regarding tariff payable to the consumers for excess energy supplied to Discom under Net Metering Regulation 2015
JPR5-830 dt 04.01.2017
Requirment of Registration Certificates/ Entrepreneur Memorandum / Udhyog Adhar Memorandum abolished prior to estblishment of Industry for Electricity Connection
JPR5-829 dt 03.01.2017
"Amnesty Scheme" : Date extended for disconnected consumers of all category upto 31st March 2017
JPR5-828 dt 30.12.2016
"Voluntary load declaration scheme" : Date extended upto 31st Jan 2017
JPR5-827 dt 30.12.2016
"Mukhya Mantri Gramin Gharelu Connection Yojna": Date extended upto 31st Jan 2017
JPR5-826 dt 30.12.2016
Clarification about applicability of tariff on Hostels
Link
Last Date Extension of "Amnesty Scheme" for realization of outstanding dues
JPR5-825 dt 16.12.2016
"Mukhaya Mantri Gramin Gharelu Connection Yojna": Date Extended upto 31st Dec 2016
JPR5-824 dt 29.11.2016
"Amnesty Scheme" for Regular/disconnected consumers for realization of outstanding dues
JPR5-823 dt 29.11.2016
Constitution of working committee
JPR5-822 dt 28.11.2016
"Voluntary load declaration scheme" : Date extended upto 31st Dec 2016
JPR5-821 dt 25.11.2016
Procedure for installation/replacement of meters
JPR5-820 dt 11.11.2016
Recovery of fule surcharge amount for 1st Qtr. of FY 2016-17
JPR5-819 dt 8.11.2016
FSA Calculation
Corrigendum in JPR5-815
JPR5-818 dt 8.11.2016
Mukhaya Mantri Gramin Gharelu Connection Yojna
JPR5-817 dt28.10.2016
Simplification of procedure for change in the name of connection
JPR5-816 dt26.10.2016
Billing of consumers having Net Metering and Grid Connectivity of Grid connected rooftop & Small Solar Photovoltaic Systems(SSPVS)
JPR5-815 dt26.10.2016
Intensive checking campaign of Agricultural connections.
JPR5-814 dt25.10.2016
Replacement of Defective Meters.
JPR5-813 dt19.10.2016
Directions for regularizing of unauthorized connections under drinking water schemes in rural areas.
JPR5-812 dt07.10.2016
"Amnesty Scheme" for disconnected consumers of all categories(disconnected upto or prior to 31.03.2015) for reliazation of outstanding dues.
JPR5-811 dt30.09.2016
TARIFF FOR SUPPLY OF ELECTRICITY-2016.
JPR5-810 dt29.09.2016
Procedure for replacement of burnt/failed distribution tranformers in rural areas.
JPR5-809 dt19.09.2016
Chief Minister's rural domestic connection Scheme.
JPR5-808 dt16.09.2016
"Voluntary increased Load scheme" For the present unauthorized increased load in agriculture connection.
JPR5-807 dt07.09.2016
Directions in respect of existing provisions of clause 51(5)(6) of 'TCOS-2004' (amended upto Dec'2012)-Redressal of Consumer's Grievances
JPR5-806 dt31.08.2016
Intensive recovery Programme
JPR5-805 dt17.08.2016
Considering the request of consumers for allowing extension of 24 Hrs. supply feeder beyond the prescribed limit of 1 KM in rural areas.
JPR5-804 dt09.08.2016
Clarification on JPR5-791 regarding shifting of electric lines (HT/LT overhead) and other structures which are hazardous to human life & property during the campaign of "Surakshit Bijli Abhiyaan"
JPR5-803 dt03.08.2016
Ratification of order No. 638 date 28.06.2016 (JPR5-799) issued by commercial wing regarding 'Amnesty Sceheme'
JPR5-802 dt22.07.2016
Detailed Guidelines & Procedure for Net Metering and Grid Connectivity of Grid Connected Rooftop & Small Solar Photovoltaic Systems
JPR5-801 dt21.07.2016
Reocnstitution of Appellate Authority
JPR5-800 dt06.07.2016
"Amnesty Scheme" for disconnected consumers of all categories (disconnected upto or prior to 31.03.2015) for relization of outstanding dues
JPR5-799 dt28.06.2016
Guidelines for erection of GBM/RTT/RTP & putting up of cell of wheel (COW) & Micro-cells on Govt./PSU/ULB/Autonomous Bodies/Co-op Institutions/ Panchayati Raj Institutions Land & Buildings
JPR5-798 dt16.06.2016
Simplification of procedure for obtaining new electricity connection in view of 'Ease of Doing Business'
JPR5-797 dt13.06.2016
Expenses for obtaining of New Industrial Electricity Connection under" Ease of Doing Business"
JPR5-796 dt08.06.2016
Detailed Guidelines & Procedure for grant of availing Open Access
JPR5-795 dt01.06.2016
Detailed Guidelines & Procedure for Net Metering and Grid Connectivity of Grid Connected Rooftop & Small Solar Photovoltic Systems
JPR5-794 dt30.05.2016
The Rajasthan Sick Micro & Small Enetrprises(Revival & Rehabilitation) scheme,2015
JPR5-793 dt30.05.2016
Simplification of procedure for obtaining new electricity connection in view of 'Ease of Doing Business'
JPR5-792 dt27.05.2016
Shifting of electric lines (HT/ LT Overhead) and other Structures which are hazardous to human life & property using the campagin of "Surakshit Bijli Abhiyaan"
JPR5-791 dt12.05.2016
Recognition for "Bhamashah Card" as a valid document for proof of Identity and proof of address
JPR5-790 dt11.05.2016
Provisions of single point Electric Supply for Residential purposes
JPR5-789 dt11.05.2016
Prescribing norms for electrification of Private Industrial area being developed by private developers
JPR5-788 dt11.05.2016
Releasing connection to inhabitants residing in Kachchi Basties/tents/temporary structures
JPR5-787 dt09.05.2016
Regarding self-certification of installation
JPR5-786 dt09.05.2016
Regarding self-certification of installation of generating units
JPR5-785 dt09.05.2016
Constitution of Appellate Authority
JPR5-784 dt06.05.2016
Fuel Surcharge amount for all four quarters of financial year 2015-16
JPR5-783 dt28.04.2016
Extension of Contract Demand of existing industrial / NDS Consumers
JPR5-782 dt28.03.2016
Order regarding Security Amount for agricultural consumers.
JPR5-781 dt16.03.2016
Guidelines for erection of GBM/RTT/RTP & putting up of Cell of Wheels(CoW) & Micro-cells on Govt./PSU/ULB/Autonomous Bodies/Co-op institutions/Panchayatiraj Institutions Land & Buildings.
"Voluntary increased Load scheme" For the present unauthorized increased load in agriculture connection.
Release of Power Connections to new Industries without consent to estabilish (CTE) from RSPCB
Prescribing norms for electrification of colonies / Housing Schemes developed by private builders / Developers / Housing Societies and releasing permanent connections therein
Ratification of order no.1378 dated 01.10.2015(JPR5-772) issued by Commercial Wing regarding recovery of Fuel Surcharge
Recovery of compounding charges in case of theft of electricity
Tariff payable to the Grid connected Rooftop & Small Solar Photovoltaic Systems under Net Metering Regulation, 2015
"Announcement of increase of Voluntarily Load Scheme" in connection of increase of unauthorized electricity load in agriculture connection
Recovery of Fuel Surcharge amount for fourth quarter of FY 2014-15
Constitution of Appellate Authority.
Laying of Optical Fibre based telecom network cables on existing electric poles of Discom(33KV/11KV/LT) of Discom for 4G communication, fixing of rental charges and interest free security amount.
Implementation of Provisions of Connectivity and Net Metering for Rooftop and Small Solar Grid Ineractive System under Net Metering Regulation-2015
Clarification regarding Provisions of Net Metering and Grid connectivity of Grid Connected RoofTop and small Solar Photovoltaic Systems
Regarding releasing of permanent electricity connection to the consumers for newly constructed/in construction buildings in urbun areas
Regarding relaxation in applicability of supply voltage
Laying of Optical Fibre based telecom network cables on existing electric poles of Discoms(33KV/11KV/LT) of Discom for 4G Communication, fixing of rental charges and interest free security amount
Revised Compounding Charges in case of Agriculture Service
Depositing of defective energy meters in Stores
Recovery of Fuel Surcharge amount for Third Quarter of FY 2014-15
Ratification of order no. 1846 dated 20.01.2015(JPR5-743), 1847 dated 20.01.2015 (JPR5-744) and 1966 dated 16.02.2015 (JPR5-746) issued by Commercial Wing regarding recovery of Fuel surcharge.
Releasing of Single phase connection to Domestic/Non Domestic consumers upto 10 KW connected load
Regarding electric connection to inhabitants of unapproved Kachi Basties
Depositing of defective energy meters in store
Prescribing norms for electrification of colonies / Housing Schemes developed by private builders / Developers / Housing Societies and releasing permanent connections therein
Detailed guidelines & Procedure for Net Metering and Grid Connectivity of Grid Connected Rooftop & Small SolarPhotovoltaic Systems.
Prescribing norms for electrification of colonies / Housing Schemes developed by private builders / Developers / Housing Societies and releasing permanent connections therein(Ref:JPR5-754)
Prescribing norms for electrification of colonies / Housing Schemes developed by private builders / Developers / Housing Societies and releasing permanent connections therein
Regarding Remit of four month electricity bills for the farmers affected from hail storm.
Levy of Electricity Duty on consumption of Self Generated Energy for any purpose in respect of energy generated by captive power generating plants other than the D.G. sets
Regarding pardon of the electricity bills of four months for the farmers affected from hailstorm of the Alwar and Baran .
Testing of the ABT Meters of the consumers availing Open Access from Energy exchange/bilateral mode
Regarding refund of excess cost of meter
Regarding applicability of Tariff on Hostels
Tariff For Supply Of Electricity-2015
Recovery of Fuel Surcharge amount for 2nd quarter of financial year 2014-15
"Voluntary increased Load scheme" For the present unauthorized increased load in agriculture connection
Recovery of Fuel Surcharge Amount
Recovery of Fuel Surcharge Amount
Release of Single Phase connection in Rural Area to Domestic/ Non Domestic consumers upto 10 KW connected load by installing meter along with AMR arrangements.
Regarding release of connections in the Prthivi Raj Nagar Scheme area.
Recovery of Fuel Surcharge Amount
Rajasthan State Regulatory Commission (Standard of Performance of Distribution Licensee) Regulation-2014
As per provision of clause -"Category of Consumer and Character of Service", of TCOS-2004 the character of service is defined . The order is regarding to follow the provision strictly.
Compliance of directions issued by "Rajasthan State Pollution Control Board " to disconnect the electric supply of consumer(s ) for non compliance of directions issued under Section31 (A) of the "Air (prevention & Control of Pollution) Act-1981 and Section-33(A ) of the" water (prevention & control of Pollution ) Act-1974.
Electrification of private Industrial Area(s) to be developed by the Builders/Developers
Regarding to provide additional metering equipment at the premises of HT supply Consumers for power factor purpose.
Procedure for releasing connections of 33 KV supply voltage.
Release of industrial and Non domestic category connection in case of voltage regulation of 11 KV feeder is more than 8% and the system improvement scheme has been sanctioned/approved
Procedure for depositing Defective Meters in stores
Replacement of Defective Meters
Installation of Auo meter reading (AMR) on mobile tower connections
Releasing of Single phase electric connection to Domestic/Non-Domestic upto 10KW connected load
Release of Industrial Connections
Recovery of Fuel Surcharge Amount
Transfer of electric connections of M/s Wireless TT info Services Ltd. and M/s Quippo Telecom Infrastructure Ltd. in the name of M/s VIOM Networks Ltd .
Regarding Defective ABT meters of Open Access Consumers .
Analysing the putput datas provided by the meter reading agencies by M&P Wing .
Regarding Remit of four month electricity bills for the farmers affected by hail storm.
Constitution of Appellate Authority. JPR5-722 dt25.03.2014
Assessment to be made in case of Burnt/Stopped/Stolen & defective meters under domestic category of rural areas
Directions for procedures prescribed in JPR5-139 & JPR5-189 to curtail delay in releasing new industrial connections/load extension
Applicability of correct tariff on the connection of Govt. school/hospitals
Charging 15% supervision charges from UIT, Kota against electrification of schemes developed by them
Release of large number of connections under NDS category to various mobile tower companies/ commercial entities
Regarding technical acceptance of electrification scheme in various residential schemes of Rajasthan Housing Board
Testing of the meters of the consumers availing Open Access from Energy exchange / bilateral mode
Regarding to issue Demand Notice in case of electrification of Affordable Housing Schemes under Affordable Housing Policy-2009
Procedure of Site Testing of Industrial/Non-Domestic Category Consumers
Permitting the applicant to provide their own meter/ metering equipment
Transfer of electric connections of M/s Bharti Infratel Ventures Ltd, M/s Idea Cellular Towers Infrastructure Ltd. and M/s Vodafone Infrastructure Ltd. in the name of M/s Indus Towers Ltd
Regarding levy of Electricity Duty, Water Conservation Cess etc. on the quantum of assessment for Civil Liability
Amendments in "Terms & Conditions for Supply of Electricity -2004"
Detailed Procedure for Availing Open Access by consumers
Recovery of fuel Surcharge amount
Regarding release of domestic connections under Chief Minister's Power Plan for everyone in Dhani having population less than 100
Tariff for supply of electricity-2013
Regarding release of domestic connections under Chief Minister's Power Plan for everyone in Dhani having population less than 100
Regarding not to give the new connections in the filling areas of the amani shah nala.
Regarding release of Large, Medium & Small industrial connections in Industrial Area
JPR5-702 dt16.05.2013
Dealing with cases of Energy Meters found slow/incorrect recording of consumption during checking/testing at the site.
JPR5-701 dt16.05.2013
Regarding to convert connections of farm house series from Domestic service to agriculture service
JPR5-700 dt03.05.2013
Order for imposing User Charges
JPR5-699 dt15.04.2013
Regarding Annual review of Security amount for Open Access consumers
JPR5-698
Regarding Right to Hearing Act-2012
JPR5-697
Office order regarding meter reading of Mobile Tower connections and Wedding House connections
JPR5-696
release of connection in population area
JPR5-695
Notice Format for calculated amount taken for compounding charges and civil liability under electricity act-2003
JPR5-694
Concession in electricity bills of four months for the farmers affected from hailstorm.
JPR5-693
Extension of time period of "Amnesty Scheme" introduced vide order no. JPR5-682 dated 8/1/2013
JPR5-692
Recovery of civil liability amount as well as compunding charges in case of first offence of theft of electricity under section-135 of the Electricity Act-2003
JPR5-691
Sharing the cost of shifting of lines(HT/LT- O/H Lines)
JPR5-690
Procedure for billing of Renewable Energy Generator
JPR5-689
Plan for Voluntary load increment
JPR5-688
Regarding release of Industrial Connections
JPR5-687
Recovery of Fuel Surcharge Amount
JPR5-686
Corrigendum in Tariff order as per JPR5-657
JPR5-685
Permitting the applicant to provide their own meter/metering equipment
JPR5-684
Regarding Relaible Power Supply to Railways
JPR5-683
Extension of time period of "Amnesty Scheme" introduced vide order no.JPR5-671 dated 8.11.2012
JPR5-682
Regarding release of industrial and non-domestic connections in Non-abadi areas / agriculture land in Rural Area
JPR5-681
Approval to authorise Director(Power Trading) to execute various Power Purchase Agreements with Power Generators
JPR5-680
Procedure for installation of main meter, check meter and stand-by meter in respect of Open Access Consumers
JPR5-679
Constitution of Appellate Authority
JPR5-678
Installation of Solar Water Heating Systems
JPR5-677
Treatment to be given to the compounding charges, recovered against theft of energy
JPR5-676
Release permanent electricity connection at newly constructed/ underconstruction buildings in urban areas
JPR5-675
Amnesty Scheme for Central Government, State Government Department and their undertakings
JPR5-674
Permitting the applicant to provide their own CT PT set if the set is not available with nigam store and recovery of rental charges from such customers
JPR5-673
Tariff for temprory connection for decoration on dewali
JPR5-672
"Amnesty Scheme" for permanently disconnected consumersof all categories(disconnected perior to 31.03.2012)for realization of outstanding dues
JPR5-671
Clarification for JPR 5- 564 regarding procedure for adjustment of energy sold by various CPPs to Rajasthan Discoms JPR5-670
Procedure for adjustment of energy sold by various CPPs to Rajasthan Discoms
JPR5-669
Procedure for adjustment of energy sold by various CPPs to Rajasthan Discoms
JPR5-668
Terms and Connections issued to deal with Open Access Consumers having demand above 1MW vide JPR5-639 dated 13.01.12
JPR5-667
Regarding certificate for the purpose of Ag. Connection
JPR5-666
Regarding the zero consumption output and necessary directions to the employees, Junior Engineer, ARO, Ledger Keeper etc.
JPR5-665
Regarding release of NDS connection in permanent wedding house
JPR5-664
Regarding to charge the cost of meter in terms of Clause 30(1) of TCOS-2004
Permitting the applicant to provide their own CTPT set, if the same is not available with Nigam Stores
Directions to maintain electricity supply and early resolution of the complaints
JPR5-661
Corrigendum
JPR5-660
Regarding implementation of "Rajasthan Right to Hearing Act -2012"
JPR5-659
Regarding inclusion of user charges on elecricity bill wih regard to the state government order JPR5-658
Tariff for Supply of Electricity-2012
JPR5-657
Deposition of Registration fee for Grievance Redressal cum Settlement Forum.
JPR5-656
Regarding release of Industrial connections
JPR5-655
Regarding the estimate of energy consumption for the period of stopped/faulty meters of the agriculture meter
JPR5-654
"Voluntary increased Load scheme" For the present unauthorized increased load in agriculture connection.
JPR5-653
Installation of star rating transformers in Residential/Commercial Buildings and its testing at Nigam's Central Testing Laboratory prior to installation
JPR5-652
Regarding household power connections for the dhani's having population less than 100 under "Chiefminister's electricity for all" scheme.
JPR5-651
Regarding Counterchecking of Meter reading.
JPR5-650
Permitting the applicant to provide their own CT-PT set if the same are not available with Nigam Stores.
JPR5-649
Regarding releasing of new power connections in Prithiviraj Nagar
JPR5-648
Permitting the applicant to provide their own CTPT set if the same are not available with Nigam Stores and recvery of rental charges from such consumers.
JPR5-647
Ratification of the Order No. 594 dated 16.4.12 (JPR5-645)
JPR5-646
Regarding release of HT-LIP connection(s) for an Induction Furnace/Arc Furnace Units.
JPR5-645
Extension of time period of "Amnesty Scheme" introduced vide Order No. JPR5-641 & JPR5-642
JPR5-644
Regarding exemption of payments for 4 months of electricity Bills for the farmers affected by coldwave and frost.
JPR5-643
"Amnesty Scheme" for permanently disconnected consumers of all categories (disconnected prior to 31.03.2011) for realization of outstanding dues.
JPR5-642
"Amnesty Scheme" for permanently disconnected consumers of all categories (disconnected prior to 31.03.2011) for realization of outstanding dues.
JPR5-641
Regarding installation of minimum three star rating pumpsets (certified BEE) by the consumers and their test/verification.
JPR5-640
Terms and conditions issued to deal with the Open Access consumers having Demand above 1 MW
JPR5-639
Release of 3Ph SIP, PHED ,NDS & Road Light Connections JPR5-638
Regarding levy of overhead charges in preparing estimates for MPs/MLAs/BADPs aided developement works. JPR5-637
Regarding voltage rebate in tariff for the connections released on 33KV supply instead of 11KV for which the consumer is entitled to be supplied power.
JPR5-636
Regarding electrification of Rural Industrial Area, developed by private Builder / Developer and releasing permanent connections therein
JPR5-635
Regarding clearanceof DPS/LPS amount against Government Departments / Undertakings
JPR5-634
Regarding release of agriculture connections with outright priority to the applicants who provide land free of cost for construction of 33/11 KV Sub station.
JPR5-633
Regarding release of three phase domestic / non domestic connections in rural areas under "Self Financing Scheme"
JPR5-632
Regarding tariff rate for the temporary power connections for collective decoration for dipawali 2011
JPR5-631
Regarding discount in elecricity bill for the installation of solar water heating system
JPR5-630
Tariff for supply of electricity–2011
JPR5-629
Permitting the applicant for industrial connection to provide their own CT-PT Set, if the Same are not available in the Nigam Stores
JPR5-628
Release of Domestic connections in a group in Non Abadi area.
JPR5-627
Charging the cost of 33KV or 11KV Bay emanating from 220KV/132 KV Sub Station or 33/11 KV Sub station for giving supply to a consumer through dedicated feeder
JPR5-626
Release of Single Point HT connection in Building Complexes and application of Tariff
JPR5-625
Regarding sanction of 33/11 KV Inter-connection lines) from sanctioned created 132 KV GSS.
JPR5-624
Regarding creation of 33/11 KV Sub-station in Urban areas and RIICO Industrial areas
JPR5-623
Prescribing norms for electrification of Colonies Housing Schemes developed by private builders / Developers / Housing Societies and releasing permanent connections therein.
JPR5-622
Ratification of Order No. 525 dt 12.05.2011 (JPR5-620) issued by Commercial Wing
JPR5-621
To exempt the payment of bills for the month dec- 2010 , Jan-2011, Feb-2011 ,Mar-2011 of the small and medium farmers affected by hail storms.
JPR5-620
Dealing with the cases of energy meters found Tampered during checking/testing at site
JPR5-619
Drawl of Power during power cut hours. JPR5-618
New rates to be charged from consumers towards the cost of meter,if it is burnt or damaged due to tempering or damages in any way including excess load
JPR5-617
Announcement of increase of "Urban Cess" in the budget of Rajasthan Govt.
JPR5-616
Prescribing norms for electrification of Colonies Housin Schemes developed by private builders / Developers and releasing connections therein
JPR5-615
Charging Security Deposit towards the Cost of meters from Agriculture Consumer (General and Special Category)
JPR5-614
Amendment in the department notification No. F.4 (1)FD/Tax-Div/200-21 dated 28.6.2004 from the billing month of January 2011.
JPR5-613
Regarding tariff rate for the temporary power connections for collective decoration for dipawali 2010
JPR5-612
Regarding shifting /removal of overhead lines
JPR5-611
Change of category from SIP to MIP in eventualities when the maximum demand exceeds 18.65 KW for more than two times in a financial year.
JPR5-610
Constitution of a Committee to examine the issues related to shifting/removal of overhead lines.
JPR5-609
Corrigendum in the order no. JPD/CE(C-I)/F4(407)/D.1423 dt. 22.07.10(JPR-607). JPR5-608
Amendments in "Terms & Conditions for Supply of Electricity -2004". JPR5-607
Amendments in "Terms & Conditions for Supply of Electricity -2004".
JPR5-606
Clarification regarding release to Petrol Pumps in Rural areas as circulated vide order no. JPR5-522
JPR5-605
Conversion of overhead lines into under ground cable in consumer's premises
JPR5-604
Rajasthan Finance Bill-2010 (Act No. 03 of 2010) thereby introducing "Urban Class".(Corrigendum) JPR5-603
Exemption from power cut /restrictions scheduled for the period 19 hrs. to 23 hrs. to large continuous process industrial consumers.
JPR5-602
Rajasthan Finance Bill-2010(Act No. 03 of 2010) thereby introducing "Urban Class".
JPR5-601
   

Website designed & maintained by IT Department of Jaipur Discom. Last Updated Dt. 10-02-2017
Nodal Officer Website:Shri Anil Gupta, Superintending Engineer(IT) Tel: 0141-2205412 E-mail: seitjvvnl@yahoo.in

Copyright 2014 Jaipur Vidyut Vitran Nigam Ltd. All Rights Reserved. Disclaimer